Hi there,
I think the cost of connection is payment of a deposit of around £75 or 150,000,000 trl depending on the exchange rate. £150 seems a bit much - is the builder expecting you all to pay the cost of the water used in the concrete used to build the places? LOL..
PS same deposit for electricity.
5-