Well it's all happening on the local canal today, no not the upside down bridge one, the one that flows down past the Adrenalin to the Pelin Hotel, where it joins up with the main canal just under the bridge that carries the main (Dolophin Roundabout) road, by the smelly sewage place. Over the last few days there has been a bit of activity that I thought might simply be reed clearing, but no it looks like this canal is going to get the full treatment like the one that goes under the upside down bridge. I knew this when I saw a tree felled and others followed! A big clue was also the fact that the footbridge outside the Adrenalin was gone, and there was all sorts of activity going on with diggers, lorries and also locals cutting down trees along the bank and preparing as firewood (Pics 1,2 and 5). The other smaller canal that runs into this 'main' canal at the crossing bridge near to the Nevada will probably have some work done on it too, but clear at this time of any work activity. (Pic4)
Judging by some of the Surveyors markings it looks like they'll be taking, temporarily at least, a good chunk of the neighbouring road/s to get the required width. (Pic3)
The other canal that runs parallel to the one described above, nearest to the main road, has not had any work started yet, but there has been a large contractor sign placed near to it, so I assume work will start there soon too.

Pic 1

Pic 2

Pic 3

Pic 4

Pic 5 (From Bridge near to Nevada looking towards Pelin Hotel and Calis town)