I noticed over the last week or so that Turk Telecom workers were rodding a new draw rope requiring dig ups as well as person access points (manhole) work along a route of BBM from Gunlukbasi and then into and along the Upside Down Bridge Road. Without going into technical detail - I know about these things!! - the length of draw rope they are pulling in was a long single cable pull, which strongly suggests that they are going to lay in a fibre optic cable... yippee I thought. yesterday I spoke to the lads undertaking the work, and they confirmed Fibre Optic, but it was not clear when it would be pulled in and then installed into the various cabinets on route, but thumbs up from me and plenty of Cok Guzel, which seemed to please them no end

. Yesterday they had reached the cabinet on the bend/corner of the road by the Cemetry, and were starting to work up the road towards the bridge/canal near to the Nevada.
So watch this space, and I'll see what else I can glean. Oh proper super fast broad with (hopefully) guaranteed speeds, with no contention.
Happy days are coming tra la la la... don't take much to make me 'appy.