My place is near there UBT - any chance of a photo or two? 
Your wish is my command.....plus a Tuborg Gold!!
The roads on the sides of the canals have been laid with the base noggin, and awaits the top coat of tar oil from the oil lorry and tipper lorries laden with the top stones, and of course the man with the whistle to orchestrate the laying of the oil and stones.
No work on the roads on the side of the upside down bridge canal, although it could be that at least one side (south side) will be laid with block paving to match in with the roads coming down from the BBM. What will happen on the other side is probably relaying of the old oil and stone road base.
No progress whatever at the back of the prom, behind Nil Bar / Bambu down to the back of the Mutlu Hotel.



