DSI are still working on the kanal near us, that runs down to the Hotel Pelin. I think the contractors are probably doing enough to satisfy their contract, after a two month shutdown. So slow!! And the roads are still in a terrible state, made worse as they dig out the bottom of the kanal, using caterpillar tracked excavators, ready for concreting. The first stage being to pile the mud from the bottom of the canal along the road, and so block it off, and then it gets blocked off again as the concrete pumps and concrete mixers do their bit, including making the road worse. And do not get me started on the consequent dust problems. Gggggggggrrrrrrrrrrrrrrrrr